Preferred options in the construction industry
Contents |
[edit] Introduction
'Preferred options' is a term usually encountered in the early stages of a project, describing acceptable outcomes in a certain arena of activities. A number of options are typically set out that are subsequently considered in more detail, with the aim of selecting a single preferred option for detailed development.
[edit] Local plans
For example, local authorities may prepare preferred options documents as key stages in the preparation of local plans, setting out a council’s preferred spatial and policy approaches for the local plan in preparation. A local plan 'preferred options consultation' document may set out the council's preferred options for bringing about sustainable development within a specific time period. Or, it may set out its preferred policy approach that will help shape its policies for determining planning applications as part of the new local plan, as well as setting out preferred options for new development within its boundaries. This may include preferred sites for new housing, employment, leisure and greenspace over a set, long-term period, possibly 20 years or more.
Prepared options for a new local plan will be published for public consultation over a specified time-frame. When the consultation period is over, the responses from the general public and possibly other stakeholders – e.g developers and local employers – are considered before final decisions are put into the local plan.
[edit] Government preferred options
The UK government publishes its preferred options on a wide-range of issues. It will usually publish its potential options, take into account the subsequent views of stakeholders and reach a conclusion on the way forward.
[edit] Design development
In the early stages of project development, feasibility studies are generally undertaken to assess the options for satisfying the client's needs. This helps decide on a single preferred option that can be developed in more detail.
For more information see: Feasibility study.
This may be followed by the preparation of a full business case and project execution plan for the preferred option and then, if a decision is taken to proceed, a detailed project brief can be prepared that can be used as a basis for a design.
[edit] Related articles on Designing Buildings Wiki
- Authority monitoring report.
- Community plan.
- Core strategy.
- Development plan.
- Development plan documents.
- Expert panel to streamline local plan-making process.
- Feasibility study.
- Local development framework.
- Neighbourhood plan.
- NPPF.
- Planning authorities.
- Planning legislation.
- Safeguarding land.
- The London Plan.
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.






















